Productive time protected
DemoUtilization rate: productive or billable hours divided by available hours.
Capacity planning models built on your own data, showing demand against capacity for teams, plants and agencies, so you decide when to hire, reschedule or add shifts.
You plan capacity in a spreadsheet, and it is out of date the day it is shared. We build capacity planning models and dashboards instead. We combine demand from your CRM, ERP or project tools with available hours, machines and skills. You see where you will be overloaded or idle weeks ahead.
Then you choose: hire, reschedule, add shifts or bring in contractors, with the cost of each option visible. Unlike capacity planning tools tied to one product, our models run on the systems you already use. Book a consultation.
Capacity planning matches what your organization can deliver, in people, machines, space or time, to the demand you expect. The goal is enough capacity to meet demand without paying for idle resources.
It works at three levels. Strategic planning looks a year or more ahead: new sites, major equipment, hiring plans. Tactical planning looks months ahead: shifts, contractors, project start dates. Operational planning covers the next days and weeks: who works on what, and which order runs on which line.
The basic math is simple. Available capacity equals resources times available time times a utilization factor. For example, take a team of 10 people with 160 working hours each per month and a 75 percent utilization target. That gives 1,200 productive hours. If forecast demand is 1,400 hours, you have a 200-hour gap to cover through hiring, overtime, contractors or rescheduling.
Capacity planning is not the same as resource planning. Capacity planning asks whether you have enough in total. Resource planning assigns specific people or machines to specific work. The first sets the limits; the second works within them.
Good capacity planning links both to the same demand forecast, so plans and assignments never drift apart.
Capacity problems show up in margins, deadlines and morale long before anyone calls them a planning issue. The root cause is usually the same: demand and capacity live in different places, and nobody sees them side by side.
Today capacity lives in one spreadsheet, updated weekly at best and disconnected from the CRM or ERP.
The model refreshes on its own.
Teams swing between overload and idle time, so overtime rises in busy weeks and utilization drops in quiet ones.
Plans change before costs rise.
Deals are accepted without checking capacity, so delivery dates slip.
Sales sees capacity before quoting.
Without a forward view, hiring comes too late or too early. Both cost money.
Hiring follows the forecast.
Utilization and bench time are not measured consistently, so their effect on profit stays hidden.
The CFO sees margin by team.
Overloads are spotted weeks ahead, so start dates can move before deadlines slip.
Clients get dates you can keep.
If two or more of these sound familiar, your planning is reacting instead of planning.
Each symptom has a direct cost. Overtime and contractors cost more than planned hours. Idle staff cost salary with no revenue. Late delivery costs client trust and, often, penalties. Late hiring costs deals you could not take.
The fix is not a bigger spreadsheet. It is a model that joins demand and capacity automatically and shows the gap by week, team and skill. Then leaders can act early, when options are still cheap.
Capacity planning also fails when it lives in one team. Sales sees pipeline. Operations sees schedules. Finance sees costs. Nobody sees all three together. Our model puts them side by side, so every leader works from the same forward view and the trade-offs become visible.
The earlier you see a gap, the more options you have and the less each one costs.
We do not hand you a generic template. The build follows a capacity planning assessment and starts only when your data and planners are ready; if they are not, we begin with advisory or training. We then build the model from your demand and capacity data, in five steps. Each step ends with a working output you can review.
Map demand. Demand you can count on. Map demand from pipeline, orders or project plans, and convert it into hours or units.
The model usually runs in Power BI and refreshes on its own. Every formula is documented, so operations and finance read the numbers the same way.
Demand and capacity are both converted into the same unit, usually hours or machine time. That sounds simple, but it is where most spreadsheets break. We agree the conversion rules with your managers, test them on recent history and adjust until the model matches reality.
Once the model is live, the weekly planning meeting changes. Instead of debating who is busy, managers review the gap and choose an action. The model then shows the effect of that action at once.
The model is planned to go live within the first phase of the engagement. We then run it alongside your current spreadsheet for a few cycles and train your planners, so your team can compare results and trust the new view before the old one is retired.
Different businesses face different limits. An agency runs out of people. A plant runs out of machine time. We build models for each type, often combined in one view.
Workforce planning: billable hours by role against pipeline, with bench time and hiring needs. Linked to pipeline. Bench time is visible. Roles and skills both count.
Production planning: machine and line load against the schedule, with the effect of extra shifts. Linked to sales orders. Shift options are priced. Changeovers are included.
Capacity requirement planning: required hours per work center against available hours, from ERP data. Built from your routings. Gaps show by period.
Lead, lag and match scenarios showing the cost and service impact of each. Each priced in the scenario. Leaders choose on facts.
Capacity requirement planning (CRP) deserves a plain explanation. It turns planned production orders into the hours needed at each work center, period by period, and compares them with available hours. It depends on accurate routings, work centers and planned production orders from an ERP with manufacturing features, such as NetSuite or Odoo.
For agencies, this is the core of capacity planning software for agencies, built on your own data instead of another tool.
In practice, many businesses need more than one type. A manufacturer plans machines and people. An agency plans roles and skills. One model can hold both, so leaders see every constraint in one place.
We start with the constraint that limits revenue most. For an agency, that is usually senior roles. For a plant, it is usually one bottleneck machine. Fixing the tightest constraint first gives the fastest return on the planning effort.
The model then shows the cost and service effect of each option, so the choice of lead, lag or match becomes a deliberate policy rather than an accident of timing.
Each KPI has a written formula and source, and targets are set with you.
Utilization rate: productive or billable hours divided by available hours.
Capacity gap: required minus available capacity per period.
Demand coverage: share of forecast demand current capacity delivers on time.
Bench rate: share of available hours not assigned to work.
Overtime and contractor share of total hours.
Read together, they show whether to add capacity, move work or hold steady. A high utilization rate with rising overtime usually points to hiring. A high bench rate suggests sales should fill the gap first.
Our sample chart, on demo data, shows a design team's demand against available hours for the next 12 weeks. Bars above the capacity line are overloads; bars well below it are idle time. On the current plan, the team is 293 hours over in weeks 6 to 9. Hiring one designer in week 4 cuts that to 51 hours. The same view also compares overtime and contractors. Book a consultation for a live walkthrough.
Managers use it in the weekly planning meeting to decide what to move, who to hire and which projects to start.
Operations leaders see overloads weeks ahead.
They can reschedule, hire or bring in contractors on their own terms, not in a rush.
Sales gets realistic delivery dates, which builds client trust. Finance sees how utilization and staffing costs drive margin, and can plan hiring against forecast demand. Teams face fewer crunch periods and less idle time, which helps retention.
Over time, the model builds a record of forecast against actual demand, so each planning cycle gets more accurate.
The result is a business that grows on purpose, not by accident.
It also makes growth plans credible to investors and lenders, because hiring and capacity are tied to demand.
Most capacity planning tools are built into one product and only see their own data. We take a different approach. We connect the systems where demand and capacity already live and build one model across them.
Typical sources are HubSpot or Salesforce for pipeline; NetSuite, Odoo, Zoho or QuickBooks for orders, production and costs; and Airtable or project tools for assignments. The model and dashboards run in Power BI. Zapier, Make or n8n collect timesheets and spreadsheet data automatically.
Already using dedicated capacity planning software? We bring its data into the wider view, so leaders see capacity next to revenue and cost.
The advantage is a single view. Pipeline, delivery and cost live side by side, so a sales commitment, a hiring decision and a margin forecast are all made on the same numbers. And because there is no new license to buy, the model fits the budget of a mid-size company.
Agencies, professional services, manufacturers and construction firms all plan capacity. What runs out first is different in each.
Billable hours, bench time and hiring needs by role, linked to pipeline.
Line and machine load, shifts and capacity requirement planning by work center.
Crews, equipment and subcontractors across projects, linked to schedules and bids.
We start with the constraint that costs you most, then add the others. The model, KPIs and planning routine stay the same, so teams across sites or departments speak one language about capacity.
Every model is built on demo data first, so you can see the structure before we connect your systems.
Available capacity equals the number of resources times available time times a utilization factor. For example, with illustrative figures, 10 people with 160 hours each and a 75 percent utilization target give 1,200 productive hours a month. Compare this with the hours forecast demand requires to find your capacity gap.
Capacity planning asks whether you have enough people, machines or time in total to meet expected demand. Resource planning assigns specific people or equipment to specific tasks and dates. Capacity planning comes first and sets the limits; resource planning then works within them.
Capacity planning often starts in spreadsheets, then moves to capacity planning tools or to modules in ERP or project software. We build tool-agnostic models in Power BI that combine CRM, ERP and project data, so capacity is visible next to pipeline, revenue and cost.
Start with a capacity planning assessment. We review how you forecast demand, where capacity data lives and how planning decisions are made today. We map your main constraints, test the data and outline the model and dashboard that fit your business.
You receive a short written recommendation with scope, timeline and price, plus quick improvements you can make even without us. If a model is premature, the recommendation says so. Prefer to start small? Our capacity planning template is a practical first step for teams still in spreadsheets.
We also offer strategic planning advisory on hiring plans, shift patterns or expansion, and an AI and data readiness assessment if capacity is part of a wider data program. Book a consultation to get started.
The assessment has a fixed scope and price, agreed before it starts. It usually involves short interviews with operations, sales and finance, and a review of sample data. One consultant leads it from start to finish.
At the end, you will know the size of your capacity gap, what is causing it and the cheapest way to close it. That answer is designed to inform the next hiring or scheduling decision.